Project name:
National coverage project with Base map data scale 1: 25,000 
Project Type:​
Capitalism
Duration of the project: 
24 months
Project end date:
07/2019 Project scope of work: Building a modern national geospatial database for baseline data and producing eleven thousand five hundred and three (11.503) base map at a scale of 1: 25,000 for the entire area of the Kingdom by using multi-spectral satellite images produced from satellites "Spot 6 and 7" and then processing them to produce most of the national main layers , Such as: Corrected satellite image layer, all kinds of digital elevations layer, valley network, road network, buildings layer, and Shaded Relief models, and then linking all products with geospatial databases and publishing them through the national geospatial platform.